This section, approximately 30 kilometers long, features digital infrastructure, free wireless internet, and a maximum speed limit of 130 kilometers per hour for vehicles.
With the opening of this road, the travel time from Vrnjacka Banja to Pojate is now reduced to 30 minutes, while the journey to Belgrade takes just two hours.
The new section of the Morava Corridor – part of the highway connecting Pojate and Preljina – was officially opened yesterday by Serbian President Aleksandar Vucic.
Preuzmite Newsmax Balkans aplikaciju:
Pratite nas na društvenim mrežama:
Komentari (0)